AI Tools for Tender Preparation - How a Real QS Uses AI to Save 8 Days of Document Review

Image
The Tender That Changed How I Work A few years ago, I was part of an in-house tendering team on a large-scale infrastructure project. Normally, our company has a dedicated tendering team for this kind of work. This time, management decided to handle it internally, and I was one of the team members assigned. The tender deadline was one month away. That sounds reasonable until you realise what one month actually means in practice: reading hundreds of pages of specifications, drawings, geotechnical reports, and contract conditions while simultaneously quantifying every work item, chasing subcontractor quotations, attending meetings with suppliers, and writing clarification queries to the client. All at the same time. My role was quantity take-off and subcontractor/supplier quotation collection, arguably the most time-critical part of the entire process. That experience taught me more about tender preparation and where AI could have genuinely helped than any training course I h...

How to Write Better AI Prompts for QS Work - Professional Templates and Real Examples

Image
My First AI Prompt Was Embarrassingly Bad When I first started learning how AI tools work, I wanted to test them on something real, something from my own professional world. So I typed this: "Generate me 10KM highway road works and calculate the quantity." The result was, in one word, useless. The AI produced generic assumptions about a hypothetical highway project, lane widths it invented, pavement thicknesses it guessed, quantities calculated from dimensions nobody had specified. None of it reflected any real project. None of it could be used professionally. It was a demonstration of what happens when you give AI nothing meaningful to work with; it fills the gap with assumptions, and those assumptions are worthless on a live construction project. But that bad result taught me something important: the problem was not the AI. The problem was me. I had not given it the information it needed. I had expected it to read my mind, and naturally, it could not. That ...

AI for Construction Claim Preparation - A FIDIC Practitioner's Guide

Image
The Moment the Engineer's Instruction Arrived I want to start with something that most construction professionals feel but rarely say out loud. When the Engineer's instruction arrived on our expressway project requesting construction of an additional access road at a point when we were approaching original completion, my first reaction was not technical. It was not commercial. It was purely human. I was shocked. And honestly, I felt deflated. After months of hard work, our entire team had mentally set ourselves to finish the project and move forward. That collective mindset, the focus, the momentum, the anticipation of completion, was instantly disrupted by one instruction. Then the practical reality started to settle in: the asphalt plant that we had been preparing to demobilize would need to stay on site for months, doing nothing. The crew members assigned to it would be standing by, idle, drawing costs every day while we waited for the access road design to be comp...

How AI is Changing Cost Estimation in Construction - A Practicing QS Guide

Image
The Day I Realized My Estimate Was Missing Something Important During a tender for a large infrastructure project, I was part of an in-house team responsible for preparing the complete cost estimate. My role was quantity take-off and pricing. We had one month to submit. Eight days into the process, while reading through the Technical Specification, I came across a requirement buried in the material testing section. The main contract said excavated material should be reused for embankment filling. Standard enough. But the specification stated that any material with a Plasticity Index greater than 15 must be disposed of at the Contractor's sole expense. No separate pay item. No mention of this in the BOQ preambles. Just one sentence in the material testing clauses that completely changed the cost picture for the earthworks package. That moment, finding something that would have been catastrophically missed by anyone who did not read every page of the specification, is why I...